Month: May 2014

May 7, 2014

Gallery

Total Power has posted new jobs to the gallery! Check out all the new 2013 projects that Total Power has worked on over the past year. If you want to work with Total Power in the future, get in touch with our sales team at sales@www.totalpower.ca. Perhaps you have a technical questions or want to learn more from our training department, check…

Continue More
May 5, 2014

BC Liquor

The BC Liquor Distribution Branch operates 195 retail stores located throughout the province under the brand BC Liquor Stores and is the largest retailers of liquor in British Columbia. The branch has 2 x 600kW Bi-Fuel Generac units that run in parallel. The generator system backs up the building’s life safety requirements along with order processing and I.T.

Continue More
May 5, 2014

Waterloo Regional Courthouse

This brand new, state of the art building opened its doors in downtown Kitchener in March 2013. In the basement of the building you will find all three units which back up the building’s life safety requirements and other services including critical data.

Continue More
May 5, 2014

Jacob Lift Station

This water treatment plant received a recent upgrade to increase the capacity of the wastewater system. The addition of a generator along with two transfer switches provides back-up for the entire water treatment process at the station.

Continue More
  • 1